VAL AVIONICS LTD
INS 429 INTEGRATED NAVIGATION SYSTEM
INSTALLATION AND OPERATOR’S MANUAL
Original Issue Page 21 of 21
7 Appendix C – INSTRUCTIONS FOR CONTINUED
AIRWORTHINESS
7.1 MAINTENANCE INSTRUCTIONS
Maintenance of the INS 429 Integrated Navigation System is on condition only. No periodic maintenance
is required. VOR calibration, in accordance with 14 CFR 91.171, is required to be checked every 30 days.
If unit is found to be out of calibration, send unit in for service. If unit is removed for service, upon re-
installation perform Post Installation check as described in section 2.4 of this manual.
August 2008
Komentáře k této Příručce